1 2023 – 2023 Consultancy Services for Feasibility Studies, Preparation of Detailed Drawing, Design and Estimate for Setting up an Electrical Testing Laboratory. Power Cell
2 2020 – 2020 Consultancy Services for Verification and Validation of Draft Commercial Contract of Power Grid Network Strengthening Project for DPDC Area. PGCB
3 2019 – 2020 Consulting Service for Analysis of Transmission and Distribution Losses and Establishing Loss Targets. Power Cell
4 2019 – 2019 Consultancy Services for Feasibility Studies, Preparation of Detailed Drawing, Design and Estimate for Underground Distribution Network in Khulan & Barishal City Corporation Area and Jessore Municipality Area for WZPDCL. ADB
5 2017 – 2020 Consultancy Services for System Studies, Planning and Improvement of BREB/PBS Distribution System by (A) Review and update the existing methodology/software used in computing SAIDI & SAIFI (B) Improved/Automated data Acquisition and control (SCADA) (c) Improved Network Protection. BREB
6 2017 – 2018 Consultancy Services for Feasibility Studies, Preparation of Detailed Drawing, Design and Estimate for Underground Distribution Network in DESCO Area. DESCO
7 2016 – 2018 Consultancy Services for Feasibility Studies for selection of Fuel Supply Route for 230MW Power Plant (Dual Fuel) at Kadda, Gazipur. RPCL
8 2016 – 2016 Consultancy Services for Verification and Validation of Draft Commercial Contract of “Power Grid Network Strengthening Project”. PGCB
9 2015 – 2016 Consultancy Services for Feasibility Studies for Installation of 50MW Power Plant (Dual Fuel) for Chittagong Port Authority. CPA
10 2015 – 2016 Consultancy Services for Preparation of a Layout Master Plan for the Ghorashal, Goalpara and Baghabari Generation Hubs. Power Cell
11 2013 – 2013 Consultancy Services for Bangladesh Power System Expansion and Efficiency Improvement Investment Program. Power Cell
12 2010 – 2014 Consultancy Services for Feasibility Studies, Site selection, Environmental Impact Assessment, Preparation of Tender Document for Construction of 50 MW (±10%) Dual Fuel Power Plant at Kadda, Gazipur. RPCL
13 2010 – 2014 Consultancy Services for Feasibility Studies, Site selection, Environmental Impact Assessment, Preparation of Tender Document for Construction of 20 MW (±10%) Dual Fuel Power Plant at Rauzan, Chittagong. RPCL
14 2010 – 2010 Consultancy Services for Feasibility Studies and Preparation Bid Document for IPP Project of HFO Fueled Power Plant at Barisal 50 MW (±10%), Chittagong 100 MW (±10%), Khulna 100 MW (±10%) on a Build, Own and Operate basis undertaken by BPDB for KDS and PHP Group. BPDB
15 2008 – 2009 Consultancy Services for 33kV Sub-transmission Network Development study of Group-C (16 PBSs of Sylhet-Chittagong Division) under System Loss Reduction Project. BREB
16 2002 – 2003 Consultancy Services for Feasibility Studies for 2 X 100MW Peaking Power Plant in the Dhaka Area under ADB Loan No : 150 1505 BAN (SF) : Ninth Power Project [Part : D] BPDB
17 2000 – 2001 Consultancy Services for Distribution Planning and Associated works under the jurisdiction of DESCO in Mirpur Area. DESCO
18 2000 – 2001 Feasibility studies and Preparation of Master Plan & Tender Document for 3X210MW STPS and Drawing & Design of 230/132/33kV Substation and 230kV Transmission Lines for the evacuation of power from Siddhirganj Power Plant to Haripur Power Plant and Meghnaghat Power Plants and also Hasnabad Grid & Maniknagor Grid. BPDB
19 2000 – 2001 Consultancy Services for Feasibility studies and Preparation of Master Plan for 4x450MW CCPP and Design of 230/132/33kV Substation and 230kV & 132kV Transmission Lines and Development of Master Plan for Meghnaghat Power Plant Complex. BPDB
20 1996 – 1997 Consultancy Services for Feasibility Studies of Greater Chittagong Power Distribution Project, Phase-III. BPDB
21 1995 – 1996 Consultancy Services for Review, Analysis and Recommendation Concerning Needed Changes or Additions to REB E&M Instruction Series-100. BREB
22 1993 – 1993 Feasibility Studies for Intensification & Expansion of REB Program for Feni, Noakhali, Laxmipur and Patuakhali District. BREB
23 1987 – 1991 Consultancy Services for North Bangladesh Tubewell Project at Boda & Atwari Thana’s for Thakurgaon District. BPDB
24 1984 – 1984 Consultancy Services for Asset Valuation and Mapping Project for Dhaka Electric Supply (DES). DES