Assignment Name: Consultancy Services for Survey, Planning, Design and Supervision of Construction and Renovation Works for Cumilla Zone Power Distribution System Development Project. | Name of Client : Bangladesh Power Development Board (BPDB) |
Detailed Description of Actual Services : Ø Route selection and preparation of the staking sheet for lines Ø Identification and recording of HV system, MV system, LV system and Service connection Ø Load Reading & Survey and Load Forecast Ø Detailed survey, planning, and design of 33kV incoming & outgoing feeders for 33/11kV Sub-stations, selection of equipment and completion of maps, SLD & stacking sheet in relation to SLD considering the load and fault level of 2030 Ø Planning and detailed network design with related software (CYME or equivalent) Ø Preparation of bill of quantities and tender documents for distribution lines Ø Supervision of the Civil Construction Work for Lines Ø Supervision of Erection of the Pole and Installation of Hardware Ø Supervise the Stringing Works Ø Supervision of the quality of civil works and installation services carried out by the Contractor at the sites Ø Supervision of the installation of substation/distribution automation equipment and the installation of SCADA communication infrastructure Ø Establish the equipment requirements of materials/equipment Ø Supervise the Protection Related Works. Testing & Commissioning for Lines Ø Preparation of Engineering Report & As-built drawings Ø Store Inventories Ø Verifying the contractor’s bill according to the progress of work, if necessary | |
Assignment Name : Retainer Consultancy Services for Dinajpur PBS 1, Barishal PBS-1, Manikgonj PBS, Kurigram-Lalmonirhat PBS, Netrokona PBS, Jessore PBS-2 & Hobigonj PBS. | Name of Client : Bangladesh Rural Electrification Board (BREB) |
|
Detailed Description of Actual Services : Ø Field Survey for new consumer Ø Preparation of the staking sheet Ø Preparation of the master plan and review of the master plan of the PBS System Ø Inventory of Existing Distribution System Ø Preparation of line Sketch Ø Preparation of fitting assembly unit, Single Line Diagram and Material list Ø Preparation of a Database and Plan for Renovation and Expansion Works Ø Existing consumer survey and collections of all relevant data for the system study Ø Study voltage drops, line loss, sectionalize power factor, fault level and block load for the substation Ø Finalization of the load forecast for the upgradation of the existing distribution Network Ø Feasibility Study for Proposed Distribution Network Ø Field data collection by the GPS machine of the PBS Distribution system and GPS data processing Ø River crossing route survey Ø Preparation of planning, design and drawing for the Proposed Distribution Network with fittings Ø Preparation of material specification and Bill of Materials Ø Preparation of BOQ, Cost Estimation, DPP, GTP, Bid Document, etc. for Existing Distribution Network Ø Preparation of BOQ, Cost Estimation, DPP, GTP, Bid Document, etc. for the Proposed system Ø Design of new 33kV/11kV Sub-station Ø Design for upgradation/Augmentation of existing Sub-station Ø Preparation of material specification Ø Supervision of construction works for the Distribution Substation works Ø Supervision of construction works for the Distribution Line Ø Testing and Commissioning of the Distribution Line Ø Testing and Commissioning of Distribution Substation Ø Preparation: Digitization of key map & detail map Ø Preparation: As-built single-line operational diagram Ø Providing Training for Operation & Maintenance planning Ø Verify the contractor’s bill and certify for payment Ø Preparation of Close-out Document. | ||
Assignment Name : Consultancy Services for Distribution Network Expansion for 100% Rural Electrification Program for Barishal PBS-1, Manikgonj PBS, Kurigram-Lalmonirhat PBS, Netrokona PBS, Jessore PBS-2 & Hobigonj PBS. | Name of Client : Bangladesh Rural Electrification Board (BREB) | |
Detailed Description of Actual Services : Ø Field Survey for new consumer Ø Preparation of the staking sheet Ø Survey and assessment of the Existing Distribution Network. Ø Preparation of Staking sheet for new/renovation/up-gradation/re-conducting/neutral installation of 33/11/6.35 kV and LT Line. Ø Preparation of BOQ and bill of materials. Ø Staking of Substation, including preparation of layout, foundation and fencing details of inventory of substation materials. Ø Supervision of New/Augmentation sub-station Construction SPC/Wood Structure. Ø Construction Supervision, including inspection of materials and workmanship of Contractor for all HT and LT lines (New/renovation/extension/dismantling/re-conducting/conversion). Ø Collection of key pole data for the HT line (only 33kV) and noting key pole location in the GPS receiver. On-site processing of GPS data and converting it to a GIS data format. Ø Preparation of as-built staking sheet for new renovation/Up-gradation/re-conductoring /dismantling /conversion/ neutral installation in line. Ø Preparation of the Close-out document against work order for Complete/half-done work for the line and sub-station. | ||
Assignment Name : Consulting Services for Engineering, Design and Supervision of Construction works for Construction of Electrical Distribution System of Barishal PBS-1, Manikgonj PBS, Kurigram-Lalmonirhat PBS, Netrokona PBS, Jessore PBS-2 & Hobigonj PBS for Up-gradation, Rehabilitation and Intensification of Distribution System Project. | Name of Client : Bangladesh Rural Electrification Board (BREB) |
Detailed Description of Actual Services : Ø Field Investigation, load data collection, & Re-design of the distribution System. Ø Design & Preparation of Staking Sheet for New/Renovation/Up-gradation/Re-conducting/Neutral Installation of 33/11 kV and LT Lines. Ø Preparation of planning, design and drawing for the Proposed Distribution Network with fittings, material specification and Bill of materials Ø Preparation of BOQ with cost estimation, DPP and GTP with Tender document Ø Staking of Sub-station Layout, including preparation of layout, foundation and fencing details of inventory of sub-station materials. Ø Supervision of New/Augmentation Sub-station Construction SPC/wood Structure. Ø Construction Supervision, including inspection of materials and workmanship of Contractor for all HT and LT lines (new/renovation/extension/dismantling/re-conducting/conversion). Ø 33/11 kV Substation Design, including all civil works with foundation design Ø Preparation of as-built staking sheet for new renovation/Up-gradation/re-conductoring /dismantling /conversion/ neutral installation in line. Ø Preparation of the Close-out document against work order for Complete/half-done work for the line and sub-station | |
Assignment Name : Consulting Services for Engineering, Design and Supervision of Construction works for Construction of Electrical Distribution System of Barishal PBS-1, Manikgonj PBS, Kurigram-Lalmonirhat PBS, Netrokona PBS, Jessore PBS-2, Hobigonj PBS & Dinajpur PBS -1 for 1.5 Million & 1.8 Million Consumer Connection Project. | Name of Client : Bangladesh Rural Electrification Board (BREB) |
Detailed Description of Actual Services : Ø Field Investigation, load data collection, & Re-design of the distribution System. Ø Design & Preparation of Staking Sheet for New/Renovation/Up-gradation/Re-conducting/Neutral Installation of 33/11 kV and LT Lines. Ø Preparation of planning, design, and drawing for the Proposed Distribution Network with fittings, material specification, and Bill of Materials Ø Preparation of BOQ with cost estimation, DPP and GTP with Tender document Ø Staking of Sub-station Layout, including preparation of layout, foundation and fencing details of inventory of sub-station materials. Ø Supervision of New/Augmentation Sub-station Construction SPC/wood Structure. Ø Construction Supervision, including inspection of materials and workmanship of Contractor for all HT and LT lines (new/renovation/extension/dismantling/re-conducting/conversion). Ø 33/11 kV Substation Design, including all civil works with foundation design Ø Preparation of as-built staking sheet for new renovation/Up-gradation/re-conductoring/dismantling /conversion/neutral installation in line. Ø Preparation of the Close-out document against work order for Complete/half-done work for the line and sub-station. | |
Assignment Name: Consulting Services for Survey, Design and Construction Supervision of 3 PBSs (Dinajpur-1, Kurigram-Lalmonirhat PBS & Jessore-PBS-2) for Rural Electrification Up-gradation Project. Under JICA loan No. BD-P63 | Name of Client : Bangladesh Rural Electrification Board (BREB) |
Detailed Description of Actual Services : Ø Field Investigation, load data collection, & Re-design of the distribution System and Review of the Master Plan. Ø Inventory of Existing Distribution System, Preparation of line Sketch, Preparation of fitting assembly unit, Single Line Diagram, Material list, Database and Plan for Renovation and Expansion Works. Ø Design & Preparation of staking sheet for new/renovation/up-gradation/re-conductoring/neutral installation of 33/11 KV and LT Line. Ø Preparation material specification with fittings and Bill of materials. Ø Preparation of BOQ, Cost Estimation, Bid Document, etc. Ø Study of sub-station expansion/extension/Up-gradation or renovation. Ø Supervision of New/Augmentation Sub-station Construction. Ø Construction Supervision, including inspection of materials and workmanship of Contractor for all HT and LT lines (new/renovation/extension/dismantling/ re-conductoring/conversion). Ø Preparation of as-built staking sheet for new renovation /Up-gradation/ re-conductoring/dismantling/conversion/ neutral installation in line. Ø Preparation of the Closeout document against the work order for Complete/half-done work for the line and sub-station. | |
Assignment Name : Consultancy Services for Central Zone Power Distribution System Development Project, Package-2 & Package-6. | Name of Client : Bangladesh Power Development Board (BPDB) |
Detailed Description of Actual Services : Ø Detailed survey of the existing distribution system. Ø Topographic survey Ø Inventory of Existing Distribution System, Preparation of line Sketch, Preparation of fitting assembly unit, Single Line Diagram, Material list, Database and Plan for Renovation and Expansion Works. Ø River crossing route survey Ø Feasibility study for Proposed Distribution Network. Ø Preparation of planning, design and drawing for the Proposed Distribution Network with fittings, material specification and Bill of materials. Ø Preparation of BOQ, Cost Estimation, DPP, GTP, etc. for Existing Distribution Network and Proposed System. Ø Staking of Sub-station Layout, including preparation of layout, foundation and fencing details of inventory of sub-station materials. Ø HV/LV line record, preparation in 1 : 1200 scale map. Ø Load survey & forecast, load flow studies, voltage drop & sectionalizing studies. Ø Load center analysis. Ø System loss study in the distribution system of each town. Ø Detail design of the proposed system, line route survey, and staking design. Ø 33/11 kV Substation Design, including all civil works with foundation design Ø Selection & installation of different categories of Meters for General/ Retail & Bulk consumers. Ø Preparation of sub-project proposal & Engineering report with Tender Document. Ø Project management, monitoring, and construction supervision of 33/11 kV sub-station & line Ø Preparation of as-built drawing and close-out document. | |
Assignment Name : Consultancy Services for 10 Town, 14 Town,16 Town & 18 Town Power Distribution System Development Project. | Name of Client : Bangladesh Power Development Board (BPDB) |
Detailed Description of Actual Services : Ø Detail Planning Ø Topographical Survey Ø Sub-Transmission Line, Distribution Line and Equipment Survey and Compilation on Map Ø Mapping of medium (33kV) and low medium (11kV) Voltage System Ø Mapping of the low-voltage system Ø Mapping of the Service Connection System Ø Distribution line equipment survey Ø Surveying of 33/11kV Sub-station Ø Store Inventory Ø Load Readings to Check Overloads Ø Voltage drop system loss and sectionalizing studies on 11 kV, 11/0.4kV and 0.4 kV systems Ø Planning of Sub-Transmission Line Ø Distribution Planning & Detailed Network Design Ø Identification of previous work i.e. work done under phase-1 Ø Preparation of Engineering Reports Ø Preparation of Construction Tender documents for 33 kV Sub-T/L 11kV,11/0.4kV,0.4kV Network & 11/0.4kV pole & pad mounted sub-station and 33/0.4KV S/s Ø Supervision work of line & S/S Construction 18) Estimated Quantity of works Ø Physical Marking of poles, transformers, and other equipment’s Ø Supply of a package (Software) programme. | |
Assignment Name: Consultancy Services for Augmentation and Renovation of Electrical Distribution System of Dhaka Cantonment area, Dhaka. | Name of Client : Bangladesh Army |
Detailed Description of Actual Services : Ø Survey & Identification and recording of HV system, MV system, LV system and Service connection Ø Load Reading & Survey and Load Forecast Ø Planning and detailed network design of 11kV Feeders and 440kV & 230kV Distribution Line. Ø Preparation of maps, SLD & stacking sheet Ø Preparation of bill of quantities and tender documents for distribution lines. Ø Drawing and Design of related Civil construction works Ø Supervision of the Erection of the Pole and Installation of Hardware. Ø Supervise the Stringing Works Ø Supervision of the quality of civil works and installation services carried out by the Contractor at the sites Ø Supervise the Protection Related Works. Ø Testing & Commissioning of Lines Ø Preparation of Engineering Report & As-built drawings Ø Verifying the contractor’s bill according to the progress of work | |
Assignment Name : Consultancy Services for Feasibility Studies, Preparation of Detailed Drawing, Design and Estimate for Underground Distribution Network in Khulan & Barishal City Corporation Area and Jessore Municipality Area for WZPDCL. | Name of Client : Asian Development Bank (ADB) |
Detailed Description of Actual Services : Ø Field survey and preparation of a Feasibility report Ø Existing Distribution Line Survey by GPS Ø Preparing a Single Line Diagram Ø AutoCAD design existing overhead Line to the Underground line Ø Design cable trance Ø Distribution system studies Ø Recommendation overhead to the underground network Ø Cost estimates for the construction of underground distribution networks in the proposed service areas Ø Problem tree analysis, design and monitoring framework Ø Technical, economic, financial, and governance due diligence Ø Detailed cost estimates Ø Social, poverty, gender, safeguards and environmental assessments and analyses Ø Summary of poverty reduction and social strategy Ø Preparation gender action plan Ø Provide on-the-job training for staff members of WZPDCL to facilitate capacity enhancement | |
Assignment Name: Consultancy Services for System Studies, Planning and Improvement of BREB/PBS Distribution System by (A) Review and update the existing methodology/software used in computing SAIDI & SAIFI (B) Improved/Automated data Acquisition and control (SCADA) (c) Improved Network Protection. | Name of Client: Bangladesh Rural Electrification Board (BREB) | |
Detailed Description of Actual Services : Ø Assessment of the current status of recording and monitoring system reliability indices; review and update the existing methodology/software used for computing SAIDI & SAIFI Ø Assessment of the present operation performance of existing networks related to operation characteristics such as voltage level and regulation, system losses, network outages etc. Ø Study of network failures experienced by the distribution system, identification of parameters influencing system reliability Ø Cost analysis of power outages Ø Recommendations for improving operational performance, including system reliability Ø Recommendations for the recording, collection and usage of operational data required for meaningful improvements in system reliability and operational performance Ø Methods & tools to analyse the data gathered and development of an independent system to establish acceptable reliability system indices to be implemented prior to the operation of a SCADA system described below Ø Recommendations for manpower, infrastructure, software, tools, machinery & equipment’s etc. required for planning and implementation of systems to monitor system operational performance and improve reliability Ø Review existing methodologies and software tools used for calculating SAIDI (System Average Interruption Duration Index) and SAIFI (System Average Interruption Frequency Index) Ø Evaluate the effectiveness and accuracy of current practices against industry standards Ø Gather historical outage data, customer service records, and maintenance logs required for SAIDI and SAIFI calculations Ø Identify data sources, ensure data quality, and assess data completeness Ø Recommend improvements to the current SAIDI and SAIFI computation methodologies, ensuring they reflect operational realities and customer experiences Ø Update calculation formulas, thresholds for interruptions, and reporting frameworks. Ø Analyze existing software capabilities and identify gaps in functionality Ø If necessary, propose the development or upgrade of software tools for real-time computation and reporting of SAIDI and SAIFI Ø Provide user training and documentation for new or updated tools. | ||
Assignment Name : Feasibility studies and Preparation of Master Plan & Tender Document for 3X210MW STPS and Drawing & Design of 230/132/33kV Substation and 230kV Transmission Lines for evacuation of power from Siddhirganj Power Plant to Haripur Power Plant and Meghnaghat Power Plants and also Hasnabad Grid & Maniknagor Grid. | Name of Client : Bangladesh Power Development Board (BPDB) |
|
Detailed Description of Actual Services : Ø Comprehensive feasibility study Ø System study, load flow studies Ø IEE, EIA and SIA studies Ø Bathymetric & Hydrological studies Ø Civil, electrical and mechanical design Ø Power evacuation studies Ø Preparation Master Plan Ø Detailed planning & design of the 230/132/33kV substation Ø Detailed planning & design of 230kV transmission line Ø Preparation of bid document Ø 230kV transmission line route from Siddhirganj to Haripur, Meghnaghat, Hasnabad & Maniknagar Ø Preparation of Master Plan for housing, living quarters & ancillary facilities, like market, mosque, clubhouse, clinic and other facilities, etc. | ||
Assignment Name: Consultancy Services as Owner’s Engineer for Construction of 330MW Dual Fuel Combined Cycle Power Plant at Khulna. | Name of Client: Bangladesh Power Development Board (BPDB) |
Detailed Description of Actual Services: Ø Checking and approval of design calculations, drawings and specifications with Cost estimation submitted by the Turn-key contractor in respect of all Land Development, Embankment and Earth Protection, Resettlement, Electrical, Mechanical, I&C, Water storage & treatment Equipment, Civil works and Ancillaries under the scope of the Turn-key contract. Ø Full-time supervision of the erection work of all Electrical, Mechanical, I&C and Civil works. Ø Witnessing post-landing inspection along with the client representative. Ø Evaluation, review and approval of the field test methods submitted by the Turn-key contractor for Ø Supervision of demolition of existing building, land filling with land development for the construction of Khulna 330MW Combined Cycle Power Plant Ø Supervision of power evacuation works, including 14 km 230 kV underground cable work termination from Khulna 330MW Combined Cycle Power Plant to Khulna South 230kV Grid Substation. Ø Examine and approve the method for testing, pre-commissioning, and commissioning procedures (submitted Ø Carry out an environmental and social impact assessment, considering the maximum generation capacity of the power plant Ø Submit operational and maintenance manuals of the Power Plant. Ø Checking and approval of all electrical, Mechanical, Civil and I&C “As Built” drawings. | |
Assignment Name : Consultancy Services as Owner’s Engineer for Construction of 210MW Thermal Power Station Project at Siddhirganj, Narayangonj. | Name of Client : Bangladesh Power Development Board (BPDB) |
Detailed Description of Actual Services : Ø Checking and approval of design calculations, drawings and specifications submitted by the Turn-key contractor in respect of all Electrical, Mechanical, I&C, Water storage & treatment Equipment, Civil works and Ancillaries under the scope of the Turn-key contract. Ø Full-time supervision of the erection work of all Electrical, Mechanical, I&C and Civil works Ø Examine and approve the method for testing, pre-commissioning, and commissioning procedures Ø Submit operational and maintenance manuals of the Power Plant. Ø Checking and approval of all electrical, Mechanical, Civil and I&C “As Built” drawings. Ø Assisting all concerned agencies to ensure proper and timely completion of the Electrical, Mechanical items of work, as well as smooth commissioning of the plant. | |
Assignment Name: Consultancy Services as Owner’s Engineer for Construction of 60 MW,71MW & 80MW Gas Turbine Power Station at Shahjibazar, Baghabari &Tongi. | Name of Client: Bangladesh Power Development Board (BPDB) |
Detailed Description of Actual Services: Ø Feasibility study Ø Topographical & Geological survey Ø Evaluation of bids Ø Environmental Assessment (EIA study) Ø Approval of all drawings Ø Supervision of construction works Ø Pre-shipment inspection and factory test Ø Testing & commissioning Ø Guarantee and acceptance test Ø Preparation O&M manual Ø Taking over the certificate Ø Training on gas turbine power station and associated substation & transmission lines for Grid line connection. | |
Assignment Name : Consultancy Services for System Study for Power Evacuation from 35 MWp Solar Power Plant at Manikganj. | Name of Client : Spectra Solar Park Ltd., Bangladesh |
Detailed Description of Actual Services : Ø Field Survey and required Data collection Ø Preparation of the Transmission line route profile for Power evacuation Ø Visit the existing Grid Substation and provide recommendations for upgradation Ø Load Flow Analysis of the Proposed Solar Power Plant. Ø Short Circuit (Symmetrical and Asymmetrical Fault) Analysis. Ø Voltage Control Analysis. Ø Reactive Power Compensation Analysis Ø Harmonic Compensation Analysis Ø Fault Ride-Through Control Analysis Ø Active Power Curtailment analysis | |
Assignment Name : Consultancy Services for Feasibility Study for Installation of 10 MWp Solar Power Plant at Balurchor Union, Shirajdikhan, Munshiganj | Name of Client : Knash Engineers Limited (KEL) |
Detailed Description of Actual Services : Ø Topographic Survey, Field Survey and Data Collection Ø Prepare a Detailed Feasibility Study Report for Establishing a Solar Power Plant. Ø Depending on the Land Area Available, Recommend the Plant Capacity. Ø Recommend the Method of Implementation of the Project Considering Economic, Financial, and Commercial Aspects. Ø Recommend the Method of Power Evacuation Ø Review the Available Technology in the Market and Recommend Ø Financial and Economic Analysis Ø Carry Out Soil Testing at the Site to Assess the Soil Condition and Bearing Capacity and Recommend the Kind of Foundation Required for the Solar Panels. Ø Carry Out a Cost-Benefit Analysis for Different Technological Options for Solar PV. Ø Carry Out Cost Estimates for the Development, Construction and Operation of the Project. Ø Required Data Collection, Analysis and Preparation IEE, EIA and SIA Study Report for Implementation of the Solar Power Plant. Ø Environmental Impact Assessment and Preparation of an Environmental Management Plan Ø Social Impact Assessment and Preparation of a Social Safeguard Policy Ø Collect Required Land Documents for Legal and Institutional Aspects of the Land, Environment and Other Issues for the Proper Implementation. Ø Prepare a Standard Tender Document for the Implementation of Solar Power Plant. | |
Assignment Name : Consultancy Services for Feasibility Study for Installation of 2 MWp Solar Power Plant at Balurchor Union, Shirajdikhan, Munshiganj | Name of Client : Knash Engineers Limited (KEL) |
Detailed Description of Actual Services : Ø Topographic Survey, Field Survey and Data Collection Ø Prepare a Detailed Feasibility Study Report for Establishing a Solar Power Plant. Ø Depending on the Land Area Available, Recommend the Plant Capacity. Ø Recommend the Method of Implementation of the Project Considering Economic, Financial, and Commercial Aspects Ø Recommend the Method of Power Evacuation Ø Review the Available Technology in the Market and Recommendation Ø Financial and Economic Analysis Ø Carry Out Soil Testing at the Site to Assess the Soil Condition and Bearing Capacity and Recommend the Kind of Foundation Required for the Solar Panels Ø Carry Out a Cost-Benefit Analysis for Different Technological Options for Solar PV. Ø Carry Out Cost Estimates for the Development, Construction and Operation of the Project. Ø Required Data Collection, Analysis and Preparation IEE, EIA and SIA Study Report for Implementation of the Solar Power Plant. Ø Environmental Impact Assessment and Preparation of an Environmental Management Plan Ø Social Impact Assessment and Preparation of a Social Safeguard Policy Ø Collect Required Land Documents for Legal and Institutional Aspects of the Land, Environment and Other Issues for the Proper Implementation Ø Prepare a Standard Tender Document for the Implementation of Solar Power Plant | |
Assignment Name : Consultancy Services for Engineering Support and Supervision of Construction Works for Construction of 400 kV/230 kV/ 132kV GIS Sub-station at Bogura & Rahanpur and Augmentation of Gopalganj 400 kV/230 kV GIS Sub-station for Southwest Transmission Grid Expansion Project. | Name of Client : Power Grid Company of Bangladesh Ltd. (PGCB) |
Detailed Description of Actual Services : Ø Construction of Bogura (West) substation with nine 400 kV Gas Insulated Switchgear (GIS) bays, two (2) 400 kV/230 kV transformers, each rated at 750 megavolt-ampere (MVA) Ø Construction of the Rahanpur 400kV Gas Insulated Switchgear (GIS) with five (5) 400 kV, two (2) 400 kV/132 kV transformers, each rated at 325 MVA, and one shunt reactor rated at 125 MVAr. Ø Augmentation of Gopalganj (North) 400kV/132 kV substation with two (2) 400 kV/230 kV transformers, each rated at 750 MVA. Ø Electromagnetic transients program (EMTP) study for the selection of reactors at Bogura (West), Rohanpur, Gopalganj (North) substations Ø Check the Contractor‘s technical design, drawings and documents submissions and submit comments and recommendations to PGCB to facilitate the approval. Ø Supervision of all civil works in the substation and switching station, erection and installation of substation equipment Ø Review factory acceptance test procedures and formats of the equipment Ø Supervision of testing and commissioning of all substation equipment, including control, protection, and metering Ø Top supervision of the final testing of fiber optic multiplexer equipment Ø Review and certification of as-built drawings and Ø Review and certification of operating and maintenance manuals. | |
Assignment Name : Consultancy Services for Detail design checking and Supervision of Construction Works for Construction of 400kV Kaliakoir to Bibiyana Double Circuit Transmission line (182km) and Associated 400 kV /230 kV /132 kV/ 33 kV substations at Kaliakoir and Bibiyna. | Name of Client : Power Grid Company of Bangladesh Ltd. (PGCB) |
Detailed Description of Actual Services : Ø Project Management Ø Checking of detailed planning & design of 400 kV Transmission Line 339 Circuit Kilometer from Kaliakoir to Bibiyna under this project Ø Checking of detail planning & design of 400kV/230kV/132kV Sub-station at Bibiyna under this project Ø Checking of detail planning & design of 400kV/230kV/132kV Sub-station at Kaliakoir under this project Ø Supervision of line Construction works, Testing & commissioning of the Transmission Line, whose Length of the line is 339 Circuit Kilometers, including Bongshai, Sitolakha, Ghorautra, Dhonu and kalni River crossing Ø Supervision of Construction of Sub-station, Testing & commissioning of Grid Sub-stations at BIBIYANA 400kV/230 kV, 400kV/235kV/33 kV, 400/520 MVA Transformer (Three Phase), 1 No. Ø Supervision of Construction of Sub-station, Testing & commissioning of Grid Sub-stations at KALIAKOIR 400kV/230kV/132 kV, Transformers 400kV/138kV/33 kV, 250/325 MVA (Three Phase)-2 (Two) No. & 400/235/33 kV, 400/520 MVA (Three Phase) -1 No. | |
Assignment Name : Consultancy Services for Enhancement of Capacity Grid Substations for 230kV/132kV GIS at Keranigonj, Dhaka and 132kV/33kV AIS at Kurigarm, Nawabganj, Narail, Srinagor and Sherpur (Bogura) with 490 km 132kV Transmission Line for the Rural Electricity Transmission and Distribution (T&D) Project. | Name of Client : Power Grid Company of Bangladesh Ltd. (PGCB) |
Detailed Description of Actual Services : Package 1: 1. Construction of Keraniganj – Nawabganj 132 kV double circuit line (25 km) 2. Construction of Magura – Narail 132 kV double circuit line on double circuit tower (40 km) 3. Construction of Tista – Kurigram132 kV single circuit line on double circuit tower (20 km) 4. Construction of Keraniganj – Sreenagar 132 kV double circuit line (15 km) 5. Construction of double circuit In-Out from Hasnabad-Aminbazar 230 kV line at the proposed Keraniganj 230/132/33 kV substation (1 km) 6. Construction of Four circuit interconnecting 132kV line with the existing line to connect the proposed Keraniganj 230/132/33 kV substation (3.5 km) 7. Construction of double circuit In-Out from Sirajganj-Bogura 132kV line at proposed Sherpur (Bogura) 132/33 kV substation (2 km) and stringing of OPGW of existing Bogura Serajganj-Shahjadpur 132kV line (101km) 8. Re-routing of the existing four-circuit 132 kV line of Keraniganj power plant at the new 230/132/33 kV GIS substation (2 km) 9. Re-conductoring Haripur – Ghorasal – Ashuganj 132 kV double circuit line (91 km) 10. Re-conductoring Haripur – Comilla – Feni 132 kV double circuit line (140 km) 11. 132 kV single circuit stringing of the existing Jhenaidaha – Magura 132 kV line (28 km) 12. 132 kV single circuit stringing of existing Rangpur -Tista 132 kV line (23 km) Package 2 1. Construction of 132/33 kV low-cost substation at Kurigram with 2×50/75 MVA transformer & 33 kV Switching Station 2. Construction of 132/33 kV AIS substation at Sherpur (Bogra) with 2×50/75 MVA transformer& 33 kV Switching Station 3. Installation of 2×50/75 MVA, 3 phase power transformer at Thakurgaon 132/33 kV S/S 4. Installation of 2×50/75 MVA, 3 phase power transformer at Palashbari 132/33 kS/S 5. Installation of 2×50/75 MVA, 3 phase power transformer at Sirajganj 132/33 kV S/S 6. Installation of 2×50/75 MVA, 3 phase power transformer at Natore 132/33 kV S/S 7. Installation of 2×50/75 MVA, 3 phase power transformer at ChapaiNawabganj132/33 kV S/S 8. Bay extension at Rangpur (1no.). Package 3 1. Construction of 230/132/33 kV GIS Substation at Keraniganj with 3×225/300 MVA transformer (230kV/132 kV) and 2×50/75 MVA transformer (132kV/33 kV) & 33 kV Switching Station. Package 4 1. Construction of 132/33 kV AIS substation at Nawabganj with 2×50/75 MVA transformer& 33 kV Switching Station 2. Construction of 132/33 kV low-cost substation at Narail with 2×50/75 MVA transformer& 33 kV Switching Station 3. Construction of 132/33 kV AIS substation at Srinagar with 2×50/75 MVA transformer& 33 kV Switching Station 4. Bay extension at Jhenaidaha (1 no.), Bay extension at Magura (3 nos.). | |